Assembly and parts

In the first release an engineer prices assembly: fill in the form, attach the files, and the price arrives in the quote.

Boards

Board source
Assembly sides

Supply

Supply option

We source from your BOM. Quantities carry a process allowance, round up to the packaging multiple and never fall below MOQ.

Scope of work

Inspection and operations

Inspection

Sourcing request from a BOM

Send the BOM and a manager returns prices, lead times and MOQ per line item. You approve every substitution.

Request files

Download a template, fill it in and attach it. Designators in the BOM and the CPL must match.

Fabrication request

A manager checks the parameters with an engineer and sends a quote with a price, a lead time and a validity date.

Anything to account for: stack, marking, packaging

One approved revision, up to 50 MB

XLSX or CSV, up to 10 MB

CSV, up to 10 MB

Files pending

The request is accepted without files: it becomes a manual estimate. The status stays visible to you and to the manager.

data processing terms

MB: ZIP 50, BOM/CPL 10